Winter offer: $250 off driveways, $100 off sealcoating
Asphalt Crack Filling by South State Paving across Southern Maryland
Call for Free Estimate

Asphalt Crack Filling and Sealing

Fill the cracks before they grow.

Free Estimate: (410) 212-8084
MHIC #05-169105 · Licensed and insured
4.9 × 53 Google reviews
Family owned. Owners on site.
Anne Arundel, Calvert + Southern Maryland

South State Paving fills cracks in asphalt driveways and parking lots, on their own or as the first step before sealcoating. George Cooper, the owner, is a fourth-generation paver. South State Paving is family owned and operated, the owners are on site on jobs, and the company holds Maryland Home Improvement Commission license #05-169105.

From the sources

What SealMaster says about crack filling

SealMaster, a pavement maintenance manufacturer, says hot rubberized crack sealant is ideally applied when the air temperature is between 45 and 65 degrees Fahrenheit in areas with cold winters, because cracks open wider in cooler weather. It says hot-pour material can go down as low as 40 degrees, while cold-applied fillers, common on home driveways, need warm, dry weather.

SealMaster says cold-applied filler should cure 24 hours before traffic, hot-pour material 15 to 20 minutes, and that periodic crack filling and sealcoating will more than double the life of asphalt pavement.

How we do it

Crack Filling step-by-step

We walk the property with you and explain every step before work starts.

Step 1: Clean + Prep
1
Clean + Prep

SealMaster says the surface must be clean and oil or grease spots treated with a primer before sealing.

Step 2: Fill Cracks
2
Fill Cracks

SealMaster says cracks should be filled before the sealer goes down.

Step 3: Two Coats
3
Two Coats

SealMaster recommends two coats of sealer, at 50 degrees and rising for 24 hours.

Step 4: Stay Off
4
Stay Off

SealMaster says to give the final coat 24 hours before traffic.

Featured Crack Filling project completed by South State Paving in Southern Maryland
Google review
“Was very fast and efficient.”
Rick William · Google review
Recent work

Crack Filling Projects

See full portfolio
Recent crack filling project by South State Paving in Southern Maryland
Recent crack filling project by South State Paving in Southern Maryland
Recent crack filling project by South State Paving in Southern Maryland
Recent crack filling project by South State Paving in Southern Maryland
Recent crack filling project by South State Paving in Southern Maryland
Recent crack filling project by South State Paving in Southern Maryland
Common questions

Crack Filling FAQs

What is the best time of year to fill cracks?

SealMaster says hot rubberized crack sealant is ideally applied between 45 and 65 degrees Fahrenheit in areas with cold winters, because cracks are open wider in cooler weather.

How soon can I drive on filled cracks?

SealMaster says cold-applied filler should cure 24 hours before traffic, and hot-pour material should cool 15 to 20 minutes.

Should cracks be filled before sealcoating?

Yes. SealMaster's sealcoating guidance says cracks should be filled before the sealer is applied.