
Asphalt Driveway Replacement in Southern Maryland
Tear out the failed driveway and pave a new one.
Free Estimate: (410) 212-8084Driveway replacement means the old surface comes out and a new driveway goes in. It is South State Paving's main service, and customers' Google reviews describe replacements, widening, grading and drainage correction done at the same time. George Cooper, the owner, is a fourth-generation paver. South State Paving is family owned and operated, the owners are on site on jobs, and the company holds Maryland Home Improvement Commission license #05-169105.
George's view is that preparation and material thickness decide how a driveway turns out. At the free estimate, the driveway gets walked with you and each step is explained before anything is torn out.
What industry sources say about replacing a driveway
The Colorado Asphalt Pavement Association says to look at the site first: the subgrade soil, drainage, utilities and the loads the driveway will carry. It says the subgrade should be graded smooth and free of organic material, with weak spots undercut and replaced, and that proper drainage, crown and slopes need to be addressed.
The National Asphalt Pavement Association calls standing water the leading cause of driveway failure. It also says asphalt is 100% recyclable and that an old driveway is typically taken back to a plant to be processed into new pavement.
- Resurface or replace?
- Do you need a permit in Maryland?
- What drives the cost of a driveway replacement
- How long does an asphalt driveway last?
Sources
- Colorado Asphalt Pavement Association (published by the Asphalt Institute), Best Practices for the Use of Asphalt Driveways, technical brief
- National Asphalt Pavement Association, Hiring an Asphalt Contractor for Driveways
Driveway Replacement step-by-step
We walk the property with you and explain every step before work starts.

We walk the property with you and explain every step before work starts. Estimates are free.

The Colorado Asphalt Pavement Association says weak spots should be undercut and replaced, and a 6 to 8 inch crushed aggregate base is usually adequate.

The same brief recommends a 2-inch bottom course and a 1.5-inch surface course for a residential driveway.

It says new asphalt can be driven on soon after placement, but it is best to wait a few days.

“The foreman and the crew were awesome.”
Driveway Replacement Projects






Driveway Replacement in your town
Driveway Replacement FAQs
How do I know if I need a full replacement or just resurfacing?
The Colorado Asphalt Pavement Association says an existing driveway can be overlaid to improve and strengthen it, as long as distressed areas such as weak spots, holes and large cracks are cut out and patched first. When the problems are in the base or the drainage, that is a replacement conversation. It gets looked at with you during the free estimate.
How much does driveway replacement cost?
It depends on the size of the area, the condition of what is underneath, drainage and grading, the material thickness, and access for equipment. South State does not publish prices. Estimates are free: call (410) 212-8084. The National Asphalt Pavement Association recommends getting bids in writing that state the pavement thickness, site preparation and drainage responsibilities, the payment schedule and the warranty.
What happens to my old driveway?
The National Asphalt Pavement Association says asphalt is 100% recyclable and that a removed driveway is typically taken back to a plant to be processed into new pavement.
Can you fix the drainage or widen the driveway at the same time?
Yes. Drainage and grading are services South State offers, and widening is work customers mention in their Google reviews. Bring it up at the estimate so it is part of the plan.



